Skip to content Skip to left sidebar Skip to right sidebar Skip to footer

Reports & Studies

Geothermal Feasibility Study

The Final Report assessing the Feasibility of Geothermal Energy was as a result of the Town and the Sussex Region commissioning the technical feasibility study to determine if the decommissioned and flooding Penobsquis Mine is a feasible source of geothermal energy, and if feasible, could it be effectively developed thereby providing the community with an economic development advantage.

Attachments

Sussex Market Study

In late 2007 Sussex Council commissioned Drummond Consulting Ltd. for the development of a Sussex Market Study.

Attachments